Syracuse University JMA Wireless Dome Stadium Roof Replacement
Syracuse, NY
Client: Syracuse University
Size: 250,000 sq. ft.
Partner: Geiger Engineers
Date Completed: November 2020
The new roof is a cable truss system clad with a mix of tension membrane and rigid panels to allow for natural light in the 250,000 sq ft arena. An external steel crown truss supports the pre-existing concrete ring beam and is designed to support more than 7,000 tons of snow.