Construction of this project began with Phase 1 of a multi-million, multi-year project in 2022 with the new front entrance. This project includes an addition and renovation to existing spaces within the Roy D. Simmons Sr. Coaches Center at Syracuse University. Outside, heated paver sidewalks were added, and a new roadway configuration, along with all new site lighting, water, sewer, and storm infrastructures. Inside, radiant heat flooring was installed in the main lobby with high-level finishes throughout, paneled walls, and decorative ceilings.
Phase 2 of the Lally Athletics Complex consisted of a 76,500sqft expansion, which included a new football operations center. The center features coaches’ offices, meeting and film rooms, locker rooms, and training facilities. The existing weight training center was updated to complement this new facility. Additionally, the former football wing was renovated to support Olympic sports, providing dedicated offices, locker rooms, lounges, and a cafeteria.