Residence Halls
Hamilton, NY
In May 2017, we broke ground on two new residence halls. Fighting an uphill battle with the site location being on a hill, the construction process began with the removal of 98,000 cubic yards of soil to level the playing field. With the two facilities running on parallel construction schedules, there were some unique challenges. Special care was taken to coordinate work with subcontractors, often engaging the use of two crews to maintain the pace. BIM coordination was also used to plan out all mechanical systems to ensure a smooth installation process.
Hayner Hoyt is proud to have had 20 of its own carpenters install a very high-end millwork package, which included wood panels, wood base, arched openings, door and window casings, and special 7-piece crown moldings in the social lounges and multipurpose rooms. The carpenters also installed all of the doors and hardware.